Tuesday, August 15, 2017

Lift bridge closure

The New York State Canal Corporation announced the lift bridge in Gasport will be closed to vehicular traffic on Aug. 21 for about four weeks for repairs and maintenance on the bridge-lifting system.

The pedestrian walkways will remain open during these repairs, except for a brief time after the bridge is first placed in the raised position. The walkways will not be handicapped accessible during the scheduled work period.

During the Gasport project, a signed detour for vehicles will be posted utilizing Route 31 (Rochester Road and Telegraph Road), Orangeport Road and Slayton Settlement Road.

The bridge work will not affect navigation on the Erie Canal or users of the Erie Canalway Trail.

Wednesday, August 2, 2017

Road closures

Starting Thursday, August 3, 2017 through Thursday, August 10,2017, from 7:00am-5:00pm, the following roads will have traffic delays/possible lane closures due to chipsealing work.

Mountain Rd- from Gasport Rd to Griswold St
Bolton Rd Hill
Peet St
Graham Rd
E. Chestnut Ridge Rd
Ditch Rd
Ertman Rd
Kinne Rd

Please be aware of construction signs and road crews.